23. Breitenfurter Straße 178

 

According to the competent authority, reclassification proceedings already exist for the neighbouring lots of the former coffin factory. Due to this fact, the building contractors and architects handed in an application for reclassification of the construction ground. A positive respond is expected within some months, after the elections.

 

 Roadmap

  • Purchase contract
  • Articles of association
  • Design study
  • Rededication of space
  • Application planning
  • Building permit
  • General contractors
  • Start of construction
  • Completion of the structural work
  • Ready for occupancy
  • Project completion

 Data & Facts

Living space
ca. 3.500 m²

New Construction Building.

Infrastructure and Location

This project is located between the two S Bahn-stations Atzgersdorf and Hetzendorf, as well as near to the bus route 62A (station: Camping Wien Süd). The motorway A21 is reached within few minutes and the leisure areas Maurer Berg, next to Rodauner Straße and the Wienerwald lie within short driving distance. Additionally, some supermarkets, like Hofer and Merkur, are located directly on the other side of the property and offer good shopping possibilities.

The Construction Project

The project comprises 62 flats and about 49 parking lots, which are of good size and height. Furthermore, all flats within the standard floors are provided with a loggia or a terrace. The apartments on the ground floor will have private gardens, which will be favourable for families with children.

News

No news available.

 Reports

 Legal Requirements

 Annual Financial Statement

 Information Material

 Excerpt